Well, it's time to bring this project back from the dead
Multiple projects at once make it difficult to devote enough time to make things happen. Things are somewhat back to normal though,
and I hope to have this car move under its own power by the end of February. We'll see how that goes
*Engine is absolutely ready to be installed. All wiring is completed, should be plug & play
*Most parts of the wiring harness are hidden out of sight.
*Slave cylinder installed in the transmission bell housing.
*OEM line was adapted to -4AN so that I can use the braided line to connect to the SC master cylinder.
Not much progress, but it's progress nonetheless. :thumbsup: